Oberried VII
Plant Trees Now Donate or gift

Oberried VII / Baden-Württemberg

At an elevation of approximately 1,250 meters, near the “Erlenbacher Hut” above Oberried, lies a fallow area that fell victim to drought and bark beetles some time ago.

11.04.2026

Since the area was buried under half a meter of snow on the originally planned date, we were able to get to work two weeks later, this time under bright sunshine. Snow was only visible on the opposite slopes of the Feldberg.
With 23 volunteers—including children and teenagers—we planted 300 trees. We chose fir, larch, and sycamore maple—species typical of mixed mountain forests, well-suited to the location. With the beautiful weather and the great view, everyone was in high spirits and motivated, giving it their all to ensure the trees were planted firmly in the ground and had the best chance of growing tall and strong.

Many thanks to everyone who made this reforestation effort possible through their hard work or donations—it means so much! A heartfelt thank you also to Ute Schneider-Ritter for the beautiful photos!
We’re still looking for donations for the next planting phase this fall.

Full of energy, we head out to the field with Stübenwasen in the background
Well-prepared, the field basks in the morning sun
© Ute Schneider-Ritter
A warm welcome from Ole to the volunteers
With power and Feldberg in the background
This curious creature is gently led to safety
Focused on the task at hand
© Ute Schneider-Ritter
Protecting against browsing requires your full attention
© Ute Schneider-Ritter
Everyone is participating with enthusiasm
© Ute Schneider-Ritter
There’s plenty of fun to be had, too
© Ute Schneider-Ritter
It goes hand in hand
© Ute Schneider-Ritter
Even the youngest ones are working hard to help out
Silver fir with browsing protection
© Ute Schneider-Ritter
Final Sprint
© Ute Schneider-Ritter
There’s a place for everyone and something for everyone to do
© Ute Schneider-Ritter
We did it—all 300 seedlings are planted
© Ute Schneider-Ritter

17.03.2026

The overgrown area has been neglected for a very long time (more than 50 years), and natural regeneration has not taken hold. The upper section has also been damaged by a storm. We plan to plant a sustainable mixed forest here as soon as possible. With an area of approximately 1.0 ha, we have quite a bit of work ahead of us and look forward to your support.

Oberried / Erlenbacher Höhe
Oberried / Erlenbacher Höhe
Oberried / Erlenbacher Höhe
Oberried / Erlenbacher Höhe
Oberried / Erlenbacher Höhe
Oberried / Erlenbacher Höhe